The Casinotuerm in Ehnen, a national monument on the banks of the Moselle River, has undergone a major restoration project to make it accessible to tourists. The architectural design was entrusted to the 2001 architects, in collaboration with Elementar and HLG consulting engineers.

The project was carried out using the “tower within a tower” concept, enabling modern facilities and new accessibility to be introduced without compromising the historic integrity of the existing structure. The primary aim of this undertaking was to revitalise the monument and transform it into a bed and breakfast. A key aspect of the project was the construction of a new steel tower, skilfully integrated into the heart of the original masonry structure. 12mm thick, welded in place and with a waxed finish, it serves both the structure by providing the necessary support and reinforcement for the historic building, and the architecture by structuring the layout and organisation of the spaces.

The new metal tower thus spans the four floors, ingeniously maximising the use of space while integrating numerous functions: vertical circulation, with the staircase; technical installations such as the heating system, water and electricity pipes; technical rooms such as the kitchen on the ground floor and the shower room on the first floor. There is also a fireplace and an office area. The three bedrooms are located around this metal element on the upper floors. This approach made it possible to maintain the existing structure, with the external masonry walls covered in lime. A new roof was installed over the existing structure.

Client: Wormeldange local authority

Architects: 2001, Elemantar

Consulting engineers: HLG

Location: Ehnen

Design and studies: 2016-2022

Completion: 2021-2022

Surface area: 172m2

This article was written in French for the Living&Workspace supplement in the December 2024 issue of Paperjam, published on 20 November. The content of the magazine is produced exclusively for the magazine. It is published on the website as a contribution to the complete Paperjam archive. Click here to subscribe to the magazine.