The modular construction site for five residences and sixteen single-family homes in the “Geetz” district of the “Wunne mat der Wooltz” project in Wiltz was launched on 14 October by the Fonds du Logement. (Photo: Fonds du Logement)

The modular construction site for five residences and sixteen single-family homes in the “Geetz” district of the “Wunne mat der Wooltz” project in Wiltz was launched on 14 October by the Fonds du Logement. (Photo: Fonds du Logement)

Build faster with less impact on the environment. That’s the aim of prefabricated modular construction. A new project has just been launched in Wiltz by the Fonds du Logement based on this model, for a projected project cost of €17.5m.

To alleviate the housing shortage, one solution that reduces both construction times and environmental impact is prefabricated modular construction. The subject is mentioned in the programme of the current coalition agreement and the government is even considering the introduction of a legal framework to facilitate the temporary installation of modular buildings on building land. The number of projects is multiplying, witness the latest: the modular construction site for five residences and sixteen single-family homes in the “Geetz” district of the “Wunne mat der Wooltz” project in Wiltz, launched this Tuesday 14 October by the Housing Fund.

The modules, fully equipped at the factory (kitchen, bathroom, technical installations), will be assembled on site to guarantee speed of execution, quality of finish and better waste management. A total of 42 one- to four-bedroom affordable rental homes will be built, spread over five lots. The units will range in size from 58 to 129m². The projected cost of the project, which is receiving financial support from the Ministry of Housing and Town and Country Planning, is exactly €17,501,080, excluding VAT and fees.

A school campus and shops

“Located on 34 hectares between Oberwiltz and Niederwiltz, the ‘Wunne mat der Wooltz’ project will include 1,085 homes, a school campus, shops, meeting places and local services. The Geetz district will be mainly residential and ideally located between the railway station, the new school campus, due to open in September 2023, and the Wooltz. It will comprise 76 homes,” adds the Fonds du Logement press release.